ad-block

Advertising seems to be blocked by your browser.

The ads help us provide this software and web site to you for free.

Please support our project by allowing our site to show ads.



Texas Instruments TUSB3410UART EVM how to download and install the driver


TUSB3410UART EVM is a Multi Port Serial device. This Windows driver was developed by Texas Instruments. USB/VID_0451&PID_341A is the matching hardware id of this device.

1. How to manually install Texas Instruments TUSB3410UART EVM driver


  1. You can download from the link below the driver installer file for the Texas Instruments TUSB3410UART EVM driver. The archive contains version 1.2.11.03 released on 2004-11-01 of the driver.
  2.  
  3. Start the driver installer file from a user account with administrative rights. If your UAC (User Access Control) is enabled please accept of the driver and run the setup with administrative rights.
  4.  
  5. Follow the driver setup wizard, which will guide you; it should be quite easy to follow. The driver setup wizard will scan your computer and will install the right driver.
  6.  
  7. When the operation finishes shutdown and restart your computer in order to use the updated driver. It is as simple as that to install a Windows driver!
  8.  
This driver was not digitally signed.
Download size of the driver: 56689 bytes (55.36 KB)
This driver was installed by many users and received an average rating of 3.2 stars out of 79738 votes.
This driver is compatible with the following versions of Windows:

  • This driver works on Windows 2000 32 bits
  • This driver works on Windows Server 2003 32 bits
  • This driver works on Windows XP 32 bits
  • This driver works on Windows Vista 32 bits
  • This driver works on Windows 7 32 bits
  • This driver works on Windows 8 32 bits
  • This driver works on Windows 8.1 32 bits
  • This driver works on Windows 10 32 bits
  • This driver works on Windows 11 32 bits



2. Using DriverMax to install Texas Instruments TUSB3410UART EVM driver


The advantage of using DriverMax is that it will install the driver for you in the easiest possible way and it will keep each driver up to date, not just this one. How can you install a driver using DriverMax? Let's follow a few steps!

  1. Start DriverMax and press on the yellow button named ~SCAN FOR DRIVER UPDATES NOW~. Wait for DriverMax to analyze each driver on your computer.
  2.  
  3. Take a look at the list of detected driver updates. Scroll the list down until you find the Texas Instruments TUSB3410UART EVM driver. Click on Update.
  4.  
  5. Finished installing the driver!
  6.  

Drivers