Advertising seems to be blocked by your browser.
The ads help us provide this software and web site to you for free.
Please support our project by allowing our site to show ads.
Henry Equipamentos E Sistemas TUSB3410UART EVM how to download and install the driver
TUSB3410UART EVM is a Multi Port Serial device. This driver was developed by Henry Equipamentos E Sistemas. The hardware id of this driver is USB/VID_0451&PID_341A; this string has to match your hardware.
1. Manually install Henry Equipamentos E Sistemas TUSB3410UART EVM driver
- Download the driver setup file for Henry Equipamentos E Sistemas TUSB3410UART EVM driver from the link below. This is the download link for the driver version 1.2.11.03 released on 2004-11-01.
-
- Start the driver setup file from a Windows account with the highest privileges (rights). If your User Access Control Service (UAC) is enabled then you will have to confirm the installation of the driver and run the setup with administrative rights.
-
- Follow the driver installation wizard, which should be pretty easy to follow. The driver installation wizard will scan your PC for compatible devices and will install the driver.
-
- Shutdown and restart your PC and enjoy the updated driver, as you can see it was quite smple.
-
This driver was not digitally signed.
The file size of this driver is 48867 bytes (47.72 KB)
This driver was rated with an average of 4 stars by 92684 users.
This driver is compatible with the following versions of Windows:
- This driver works on Windows 2000 32 bits
- This driver works on Windows Server 2003 32 bits
- This driver works on Windows XP 32 bits
- This driver works on Windows Vista 32 bits
- This driver works on Windows 7 32 bits
- This driver works on Windows 8 32 bits
- This driver works on Windows 8.1 32 bits
- This driver works on Windows 10 32 bits
- This driver works on Windows 11 32 bits
2. How to install Henry Equipamentos E Sistemas TUSB3410UART EVM driver using DriverMax
The advantage of using DriverMax is that it will setup the driver for you in the easiest possible way and it will keep each driver up to date. How easy can you install a driver with DriverMax? Let's take a look!
- Open DriverMax and push on the yellow button named ~SCAN FOR DRIVER UPDATES NOW~. Wait for DriverMax to scan and analyze each driver on your PC.
-
- Take a look at the list of driver updates. Scroll the list down until you locate the Henry Equipamentos E Sistemas TUSB3410UART EVM driver. Click on Update.
-
- That's all, the driver is now installed!
-
Drivers