Advertising seems to be blocked by your browser.
The ads help us provide this software and web site to you for free.
Please support our project by allowing our site to show ads.
Texas Instruments TUSB3410 UART EVM driver download and installation
TUSB3410 UART EVM is a Multi Port Serial device. The developer of this driver was Texas Instruments. USB/VID_14B0&PID_341A is the matching hardware id of this device.
1. How to manually install Texas Instruments TUSB3410 UART EVM driver
- Download the driver setup file for Texas Instruments TUSB3410 UART EVM driver from the link below. This download link is for the driver version 1.2.11.08 dated 2005-05-31.
-
- Start the driver installation file from a Windows account with administrative rights. If your User Access Control Service (UAC) is enabled then you will have to accept of the driver and run the setup with administrative rights.
-
- Go through the driver setup wizard, which should be pretty straightforward. The driver setup wizard will analyze your PC for compatible devices and will install the driver.
-
- Restart your computer and enjoy the fresh driver, it is as simple as that.
-
This driver is not digitally signed.
File size of the driver: 50296 bytes (49.12 KB)
This driver received an average rating of 3.8 stars out of 39971 votes.
This driver was released for the following versions of Windows:
- This driver works on Windows 2000 32 bits
- This driver works on Windows Server 2003 32 bits
- This driver works on Windows XP 32 bits
- This driver works on Windows Vista 32 bits
- This driver works on Windows 7 32 bits
- This driver works on Windows 8 32 bits
- This driver works on Windows 8.1 32 bits
- This driver works on Windows 10 32 bits
- This driver works on Windows 11 32 bits
2. The easy way: using DriverMax to install Texas Instruments TUSB3410 UART EVM driver
The advantage of using DriverMax is that it will setup the driver for you in the easiest possible way and it will keep each driver up to date. How easy can you install a driver using DriverMax? Let's take a look!
- Open DriverMax and press on the yellow button named ~SCAN FOR DRIVER UPDATES NOW~. Wait for DriverMax to analyze each driver on your computer.
-
- Take a look at the list of available driver updates. Scroll the list down until you find the Texas Instruments TUSB3410 UART EVM driver. Click on Update.
-
- Finished installing the driver!
-
Drivers