Advertising seems to be blocked by your browser.
The ads help us provide this software and web site to you for free.
Please support our project by allowing our site to show ads.
Texas Instruments TUSB3410 UART EVM - two ways of downloading and installing the driver
TUSB3410 UART EVM is a Ports hardware device. This driver was developed by Texas Instruments. USB/VID_0451&PID_341A is the matching hardware id of this device.
1. Manually install Texas Instruments TUSB3410 UART EVM driver
- Download the setup file for Texas Instruments TUSB3410 UART EVM driver from the location below. This download link is for the driver version 6.7.4.0 dated 2016-09-07.
-
- Run the driver setup file from a Windows account with administrative rights. If your UAC (User Access Control) is started then you will have to accept of the driver and run the setup with administrative rights.
-
- Go through the driver installation wizard, which should be quite easy to follow. The driver installation wizard will analyze your PC for compatible devices and will install the driver.
-
- Shutdown and restart your PC and enjoy the updated driver, as you can see it was quite smple.
-
Texas Instruments applied a digital signature to this driver.
Size of this driver: 1471765 bytes (1.40 MB)
This driver was rated with an average of 4.2 stars by 41471 users.
This driver is fully compatible with the following versions of Windows:
- This driver works on Windows 2000 32 bits
- This driver works on Windows Server 2003 32 bits
- This driver works on Windows XP 32 bits
- This driver works on Windows Vista 32 bits
- This driver works on Windows 7 32 bits
- This driver works on Windows 8 32 bits
- This driver works on Windows 8.1 32 bits
- This driver works on Windows 10 32 bits
- This driver works on Windows 11 32 bits
2. Using DriverMax to install Texas Instruments TUSB3410 UART EVM driver
The advantage of using DriverMax is that it will install the driver for you in just a few seconds and it will keep each driver up to date. How can you install a driver using DriverMax? Let's take a look!
- Start DriverMax and press on the yellow button named ~SCAN FOR DRIVER UPDATES NOW~. Wait for DriverMax to analyze each driver on your PC.
-
- Take a look at the list of detected driver updates. Search the list until you find the Texas Instruments TUSB3410 UART EVM driver. Click the Update button.
-
- Enjoy using the updated driver! :)
-
Drivers