Advertising seems to be blocked by your browser.
The ads help us provide this software and web site to you for free.
Please support our project by allowing our site to show ads.
Driver for Texas Instruments TUSB3410 UART EVM - downloading and installing it
TUSB3410 UART EVM is a Ports hardware device. This Windows driver was developed by Texas Instruments. In order to make sure you are downloading the exact right driver the hardware id is USB/VID_0451&PID_341A.
1. How to manually install Texas Instruments TUSB3410 UART EVM driver
- You can download from the link below the driver installer file for the Texas Instruments TUSB3410 UART EVM driver. The archive contains version 6.7.2.0 dated 2013-03-20 of the driver.
-
- Run the driver installer file from a user account with the highest privileges (rights). If your User Access Control (UAC) is running please confirm the installation of the driver and run the setup with administrative rights.
-
- Follow the driver setup wizard, which will guide you; it should be pretty easy to follow. The driver setup wizard will analyze your computer and will install the right driver.
-
- When the operation finishes shutdown and restart your PC in order to use the updated driver. As you can see it was quite smple to install a Windows driver!
-
There is no digital signature available for this driver.
Size of this driver: 0 bytes (0 B)
This driver received an average rating of 3 stars out of 91453 votes.
2. Installing the Texas Instruments TUSB3410 UART EVM driver using DriverMax: the easy way
The most important advantage of using DriverMax is that it will install the driver for you in the easiest possible way and it will keep each driver up to date, not just this one. How easy can you install a driver with DriverMax? Let's follow a few steps!
- Start DriverMax and push on the yellow button named ~SCAN FOR DRIVER UPDATES NOW~. Wait for DriverMax to scan and analyze each driver on your PC.
-
- Take a look at the list of driver updates. Search the list until you locate the Texas Instruments TUSB3410 UART EVM driver. Click on Update.
-
- Enjoy using the updated driver! :)
-
Drivers