Advertising seems to be blocked by your browser.
The ads help us provide this software and web site to you for free.
Please support our project by allowing our site to show ads.
Texas Instruments TUSB3410 UART EVM - two ways of downloading and installing the driver
TUSB3410 UART EVM is a Ports hardware device. The Windows version of this driver was developed by Texas Instruments. In order to make sure you are downloading the exact right driver the hardware id is USB/VID_0451&PID_341A.
1. How to manually install Texas Instruments TUSB3410 UART EVM driver
- You can download from the link below the driver setup file for the Texas Instruments TUSB3410 UART EVM driver. The archive contains version 6.5.9019.1 released on 2012-09-11 of the driver.
-
- Start the driver installer file from a user account with the highest privileges (rights). If your User Access Control (UAC) is running please accept of the driver and run the setup with administrative rights.
-
- Follow the driver setup wizard, which will guide you; it should be quite easy to follow. The driver setup wizard will scan your PC and will install the right driver.
-
- When the operation finishes shutdown and restart your computer in order to use the updated driver. As you can see it was quite smple to install a Windows driver!
-
This driver is not digitally signed.
Size of this driver: 0 bytes (0 B)
This driver received an average rating of 3.4 stars out of 18413 votes.
2. Installing the Texas Instruments TUSB3410 UART EVM driver using DriverMax: the easy way
The advantage of using DriverMax is that it will install the driver for you in the easiest possible way and it will keep each driver up to date, not just this one. How easy can you install a driver with DriverMax? Let's follow a few steps!
- Start DriverMax and click on the yellow button named ~SCAN FOR DRIVER UPDATES NOW~. Wait for DriverMax to scan and analyze each driver on your computer.
-
- Take a look at the list of available driver updates. Scroll the list down until you locate the Texas Instruments TUSB3410 UART EVM driver. Click the Update button.
-
- Enjoy using the updated driver! :)
-
Drivers