ad-block

Advertising seems to be blocked by your browser.

The ads help us provide this software and web site to you for free.

Please support our project by allowing our site to show ads.



Texas Instruments TUSB3410 UART EVM - two ways of downloading and installing the driver


TUSB3410 UART EVM is a Ports hardware device. The Windows version of this driver was developed by Texas Instruments. USB/VID_0451&PID_341A is the matching hardware id of this device.

1. How to manually install Texas Instruments TUSB3410 UART EVM driver


  1. Download the setup file for Texas Instruments TUSB3410 UART EVM driver from the location below. This download link is for the driver version 6.5.9017.0 released on 2009-10-20.
  2.  
  3. Run the driver installation file from a Windows account with administrative rights. If your User Access Control (UAC) is running then you will have to confirm the installation of the driver and run the setup with administrative rights.
  4.  
  5. Go through the driver installation wizard, which should be quite easy to follow. The driver installation wizard will analyze your PC for compatible devices and will install the driver.
  6.  
  7. Shutdown and restart your PC and enjoy the fresh driver, it is as simple as that.
  8.  
There is no digital signature available for this driver.
The file size of this driver is 0 bytes (0 B)
This driver received an average rating of 3.2 stars out of 40654 votes.




2. Using DriverMax to install Texas Instruments TUSB3410 UART EVM driver


The advantage of using DriverMax is that it will install the driver for you in the easiest possible way and it will keep each driver up to date. How easy can you install a driver with DriverMax? Let's see!

  1. Start DriverMax and push on the yellow button that says ~SCAN FOR DRIVER UPDATES NOW~. Wait for DriverMax to analyze each driver on your computer.
  2.  
  3. Take a look at the list of driver updates. Scroll the list down until you locate the Texas Instruments TUSB3410 UART EVM driver. Click the Update button.
  4.  
  5. That's all, the driver is now installed!
  6.  

Drivers