ad-block

Advertising seems to be blocked by your browser.

The ads help us provide this software and web site to you for free.

Please support our project by allowing our site to show ads.



Download and install Texas Instruments TUSB3410 UART EVM driver


TUSB3410 UART EVM is a Ports device. This driver was developed by Texas Instruments. The hardware id of this driver is USB/VID_0451&PID_341A.

1. How to manually install Texas Instruments TUSB3410 UART EVM driver


  1. You can download from the link below the driver setup file for the Texas Instruments TUSB3410 UART EVM driver. The archive contains version 6.5.9003.1 dated 2008-05-09 of the driver.
  2.  
  3. Start the driver installer file from a user account with the highest privileges (rights). If your User Access Control Service (UAC) is started please accept of the driver and run the setup with administrative rights.
  4.  
  5. Go through the driver setup wizard, which will guide you; it should be quite easy to follow. The driver setup wizard will scan your PC and will install the right driver.
  6.  
  7. When the operation finishes shutdown and restart your computer in order to use the updated driver. As you can see it was quite smple to install a Windows driver!
  8.  
Texas Instruments applied a digital signature to this driver.
File size of the driver: 1476153 bytes (1.41 MB)
This driver received an average rating of 5 stars out of 30636 votes.
This driver will work for the following versions of Windows:

  • This driver works on Windows 2000 64 bits
  • This driver works on Windows Server 2003 64 bits
  • This driver works on Windows XP 64 bits
  • This driver works on Windows Vista 64 bits
  • This driver works on Windows 7 64 bits
  • This driver works on Windows 8 64 bits
  • This driver works on Windows 8.1 64 bits
  • This driver works on Windows 10 64 bits
  • This driver works on Windows 11 64 bits



2. How to install Texas Instruments TUSB3410 UART EVM driver using DriverMax


The most important advantage of using DriverMax is that it will install the driver for you in the easiest possible way and it will keep each driver up to date, not just this one. How can you install a driver with DriverMax? Let's see!

  1. Open DriverMax and click on the yellow button named ~SCAN FOR DRIVER UPDATES NOW~. Wait for DriverMax to analyze each driver on your computer.
  2.  
  3. Take a look at the list of available driver updates. Scroll the list down until you find the Texas Instruments TUSB3410 UART EVM driver. Click the Update button.
  4.  
  5. Finished installing the driver!
  6.  

Drivers