ad-block

Advertising seems to be blocked by your browser.

The ads help us provide this software and web site to you for free.

Please support our project by allowing our site to show ads.



Texas Instruments TUSB3410 UART EVM driver download and installation


TUSB3410 UART EVM is a Multi Port Serial hardware device. This driver was developed by Texas Instruments. In order to make sure you are downloading the exact right driver the hardware id is USB/VID_0451&PID_341A.

1. Install Texas Instruments TUSB3410 UART EVM driver manually


  1. Download the driver setup file for Texas Instruments TUSB3410 UART EVM driver from the link below. This is the download link for the driver version 1.2.11.08 released on 2005-05-31.
  2.  
  3. Start the driver setup file from a Windows account with the highest privileges (rights). If your User Access Control Service (UAC) is enabled then you will have to accept of the driver and run the setup with administrative rights.
  4.  
  5. Go through the driver installation wizard, which should be quite straightforward. The driver installation wizard will scan your PC for compatible devices and will install the driver.
  6.  
  7. Shutdown and restart your computer and enjoy the updated driver, as you can see it was quite smple.
  8.  
This driver is not digitally signed.
File size of the driver: 39719 bytes (38.79 KB)
This driver received an average rating of 3.1 stars out of 59569 votes.
This driver will work for the following versions of Windows:

  • This driver works on Windows 2000 32 bits
  • This driver works on Windows Server 2003 32 bits
  • This driver works on Windows XP 32 bits
  • This driver works on Windows Vista 32 bits
  • This driver works on Windows 7 32 bits
  • This driver works on Windows 8 32 bits
  • This driver works on Windows 8.1 32 bits
  • This driver works on Windows 10 32 bits
  • This driver works on Windows 11 32 bits



2. Installing the Texas Instruments TUSB3410 UART EVM driver using DriverMax: the easy way


The advantage of using DriverMax is that it will install the driver for you in the easiest possible way and it will keep each driver up to date. How can you install a driver with DriverMax? Let's follow a few steps!

  1. Start DriverMax and push on the yellow button named ~SCAN FOR DRIVER UPDATES NOW~. Wait for DriverMax to scan and analyze each driver on your computer.
  2.  
  3. Take a look at the list of available driver updates. Search the list until you locate the Texas Instruments TUSB3410 UART EVM driver. Click the Update button.
  4.  
  5. That's all, the driver is now installed!
  6.  

Drivers