Advertising seems to be blocked by your browser.
The ads help us provide this software and web site to you for free.
Please support our project by allowing our site to show ads.
AltiGen Communications Inc. C6452 EVM Board how to download and install the driver
C6452 EVM Board is a AltiGenDeviceClass hardware device. The developer of this driver was AltiGen Communications Inc.. The hardware id of this driver is PCI/VEN_104C&DEV_B001&SUBSYS_00000000&REV_01.
1. Install AltiGen Communications Inc. C6452 EVM Board driver manually
- Download the setup file for AltiGen Communications Inc. C6452 EVM Board driver from the link below. This download link is for the driver version 6.5.1.8 released on 2010-10-27.
-
- Run the driver installation file from a Windows account with administrative rights. If your User Access Control (UAC) is enabled then you will have to confirm the installation of the driver and run the setup with administrative rights.
-
- Follow the driver setup wizard, which should be quite straightforward. The driver setup wizard will analyze your PC for compatible devices and will install the driver.
-
- Shutdown and restart your PC and enjoy the new driver, it is as simple as that.
-
This driver is digitally signed.
File size of the driver: 96990 bytes (94.72 KB)
Driver rating 4.6 stars out of 38052 votes.
This driver was released for the following versions of Windows:
- This driver works on Windows 2000 32 bits
- This driver works on Windows Server 2003 32 bits
- This driver works on Windows XP 32 bits
- This driver works on Windows Vista 32 bits
- This driver works on Windows 7 32 bits
- This driver works on Windows 8 32 bits
- This driver works on Windows 8.1 32 bits
- This driver works on Windows 10 32 bits
- This driver works on Windows 11 32 bits
2. The easy way: using DriverMax to install AltiGen Communications Inc. C6452 EVM Board driver
The advantage of using DriverMax is that it will install the driver for you in the easiest possible way and it will keep each driver up to date, not just this one. How easy can you install a driver with DriverMax? Let's see!
- Open DriverMax and click on the yellow button that says ~SCAN FOR DRIVER UPDATES NOW~. Wait for DriverMax to scan and analyze each driver on your PC.
-
- Take a look at the list of driver updates. Search the list until you locate the AltiGen Communications Inc. C6452 EVM Board driver. Click the Update button.
-
- Enjoy using the updated driver! :)
-
Drivers